Ystad Arena is located in the southern Swedish city of Ystad, and is the home arena of Ystad IF HF which is one of the country’s top handball teams. On its roof, 36 collectors from Savosolar were mounted during spring 2017. The system is owned and maintained by the municipality owned energy company Ystad Energi AB, and feeds its district heating network with clean thermal energy. Ystad Energi AB is working towards the goal of becoming fossil fuel free by 2020 and currently produces ca. 160,000 MWh of thermal energy annually, of which 97-99% are based on bio-fuels.
As much as 89% of the thermal energy for the district heating network is produced by four wood chip burners between 3 and 10 MW capacity and the rest is produced from straw, rapeseed, gas and oil. Ystad Energi AB has ca. 1,850 customers, of which ca. 1,300 are single family homes.
Veolia, a global corporation with focus on transport, waste, water and energy built and operate a new district heating network for the city of Voreppe, France.
For this solar installation, the space available for collectors was limited to a structure in midair between two buildings. Having a high solar yield was important criteria. Consequently, Veolia chose the well-designed Savosolar solution and its Savo 15 DG flat plate collectors being the most efficient in the market.
This installation in Voreppe was Savosolar’s first turn-key delivery for district heating in France. It raised interest among the district heating sector showing the potential of solar thermal as a clean heat production.
With this new solar thermal plant for newHeat, Savosolar add a new leading reference in the French market of solar district heating. This approximately 3,000 m2 solar thermal field (aperture), will allow to replace 2,410 MWh of former gas heated heat by renewable heat on Narbonne’s city network, manage by a subsidary of Dalkia.
Savosolar, on the behalf of newHeat, built mainly the whole solar plant, from the solar collector’s field until the outlet of the heat exchanger to the storage thermal tank, ie: solar field, piping and solar station. More then 200 of our Savo 15 SG-M collectors, ensuring a high energy yield while reducing 510 tons of CO2 emissions per year from the district heating system of the city. The production of solar field during winter will even allow an increasing of the yield of the existing biomass boiler.
Largest solar thermal plant in Finland
Savosolar has been selected as general contractor to build the largest solar thermal system in Finland to date, on behalf of Etelä Savon Energia Oy for its district heating network, which supplies households with healthy heating. The plant operate as an additional peak load sources during summer season while the main boilers are out of service.