Savosolar delivered -once again- the largest solar thermal installation in Finland. This system is located way North in Tupos, Liminka - less than 200 km from the Arctic Circle.
The heating load of Tupos district heating is usually covered by wood pellets. Yet during summer time, the load is often so low, that the substantial wood pellet burner cannot be properly used and an oil burner got used, instead. The special challenge here has been to design a very efficient solar thermal system that could replace the oil consumption in summer to run the district heating network almost completely fossil-free.
Savosolar and its partner Jorgensen have been selected by Grupo Mexico for the implementation of their first solar thermal plant to deliver carbon free heat to their mining process. In this very energy efficient mining process, only 62 pieces of Savo 15SGM large scale high performance flat plate collectors are sufficient deliver 1,2 GWh of energy over the year and cover 100% of the production need during most of the sunny season.
With a size over 13,000 m2, this system is the second largest solar heating system in France and the second largest solar thermal system for industrial process heating in Europe. Savosolar has delivered the largest part of the whole solar thermal plant including the solar collector field, civil work, piping and design and delivery of heat exchange station.
Kyotherm and its affiliate Kyotherm Solar are investment companies which specialize in the third-party financing of renewable heat and energy efficiency projects. Kyotherm Solar is selling heat from this system to a malt drying factory, which is operated by Malteries Franco-Suisses.
Løgumkloster Fjernvarme is a district heating company which annually supplies 35,000 MWh of heat to over 1,500 customers. Heat is produced with a hybrid heating system consisting of a 3 MW pellet boiler, a 1.3 MW hybrid heatpump, a 3 MW absorption heat pump and a solar collector field of 15,300 m2. Additionally, the plant has two gas engines which are capable of producing 7.6 MW of heat and 6 MW of electricity and a 10 MW gas boiler which acts as back-up.
In 2015, Savosolar delivered a 9,700 m2 solar thermal field to Løgumkloster. The second order of 5,600 m2 was delivered and commissioned in the beginning of 2016. The complete field consists of 1030 Savo 15 SG collectors and covers about 20% of the annual thermal energy need of the district heating network. The largest part of the heat demand is covered by the pellet boiler, but Løgumkloster Fjernvarme has plans to change this in the future by extending the solar field and building a large seasonal water storage.