District heating

Voreppe

Veolia, a global corporation with focus on transport, waste, water and energy built and operate a new district heating network for the city of Voreppe, France.

For this solar installation, the space available for collectors was limited to a structure in midair between two buildings. Having a high solar yield was important criteria. Consequently, Veolia chose the well-designed Savosolar solution and its Savo 15 DG flat plate collectors being the most efficient in the market.

This installation in Voreppe was Savosolar’s first turn-key delivery for district heating in France. It raised interest among the district heating sector showing the potential of solar thermal as a clean heat production.

Location

France

Construction status

Finished

Installation year

2018

Solution type

District heating

Number of collectors

–

Collector Area

163 m2
, gross

Collector Type

Savo 15 DG

Power

114 kW

Energy production

–

Ystad Energi AB

Ystad Arena is located in the southern Swedish city of Ystad, and is the home arena of Ystad IF HF which is one of the country’s top handball teams. On its roof, 36 collectors from Savosolar were mounted during spring 2017. The system is owned and maintained by the municipality owned energy company Ystad Energi AB, and feeds its district heating network with clean thermal energy. Ystad Energi AB is working towards the goal of becoming fossil fuel free by 2020 and currently produces ca. 160,000 MWh of thermal energy annually, of which 97-99% are based on bio-fuels.

As much as 89% of the thermal energy for the district heating network is produced by four wood chip burners between 3 and 10 MW capacity and the rest is produced from straw, rapeseed, gas and oil. Ystad Energi AB has ca. 1,850 customers, of which ca. 1,300 are single family homes.

Suur-Savon Sähkö

Savosolar has been selected as general contractor to build the largest solar thermal system in Finland to date, on behalf of Suur-Savon Sähkö Oy for its district heating network in Puumala, which supplies households with healthy heating. In this hybrid installation the solar thermal system is producing both, high-temperature heat to district heating supply pipe and also low-temperature heat to improve heat pump plant COP.

Pons

A new forerunner project on the large scale solar thermal market in which Savosolar has been involved: The first solar thermal field with double glasses collectors on trackers. This innovation has been done to optimize the annual solar production with a limited available area. This new solar thermal plant is a property of newHeat and will delivered heat the network of the city of Pons, which is managed by Dalkia.

Savosolar supply on this project consist in the complete solar field field as a turnkey solution, it means, the design, the supply and the installation of the solar collectors and its trackers, as well as the piping, until the solar station. It represents 112 Savo 15 DG-M collectors, which will reduce of 210 tons per year the CO2 emissions for the city’s heat needs.