District heating, Industrial process heating

Bad Rappenau

Finished

UNDER CONSTRUCTION

Bad Rappenau, Germany (largest flat plate collector plant in Germany)

Savosolar has been selected as general contractor to build a +20 MW solar thermal system on behalf of Bauer Holzenergie GmbH for its district heating network, which supplies households and an industrial process for drying fruits with healthy heating. Only about 1,800 pieces of Savo 16S large scale high performance flat plate collectors are sufficient to getting combined with an 8,000 m³ heat storage tank and
provide carbon free heat for the needs of all connected consumers.
Additionally, a PV system will be built on site to generate the electricity consumed by the solar pumps, thus
unburdening the local power grid.

Location

Germany

Construction status

Finished

Installation year

2024

Solution type

District heating, Industrial process heating

Number of collectors

1 809

Collector Area

26 827 m2
, gross

Collector Type

Savo 16 S

Power

20.4 MW

Energy production

13 000
MWh/a

Voreppe

Veolia, a global corporation with focus on transport, waste, water and energy built and operate a new district heating network for the city of Voreppe, France.

For this solar installation, the space available for collectors was limited to a structure in midair between two buildings. Having a high solar yield was important criteria. Consequently, Veolia chose the well-designed Savosolar solution and its Savo 15 DG flat plate collectors being the most efficient in the market.

This installation in Voreppe was Savosolar’s first turn-key delivery for district heating in France. It raised interest among the district heating sector showing the potential of solar thermal as a clean heat production.

Narbonne

With this new solar thermal plant for newHeat, Savosolar add a new leading reference in the French market of solar district heating. This approximately 3,000 m2 solar thermal field (aperture), will allow to replace 2,410 MWh of former gas heated heat by renewable heat on Narbonne’s city network, manage by a subsidary of Dalkia.

Savosolar, on the behalf of newHeat, built mainly the whole solar plant, from the solar collector’s field until the outlet of the heat exchanger to the storage thermal tank, ie: solar field, piping and solar station. More then 200 of our Savo 15 SG-M collectors, ensuring a high energy yield while reducing 510 tons of CO2 emissions per year from the district heating system of the city. The production of solar field during winter will even allow an increasing of the yield of the existing biomass boiler.

Grenaa Varmeværk

Savosolar was happy to sign its so far largest delivery contract with Grenaa Varmeværk in 2018. Savosolar’s highly efficient Savo 15 premium collectors are installed right next to an existing solar collector field which had been commissioned in 2014.

In this turn-key project Savosolar acts as the main contractor enlarging the solar fraction of the district heating network. Its operator, Grenaa Varmeværk, is producing about 146,000 MWh of heat per year. By using solar thermal it has managed to keep their customers´ heat price among the lowest in the whole of Denmark.

The new solar field with Savosolar collectors will increase the overall solar yield and ensure lowest energy production costs also in the future.