Ystad Energi AB - Savosolar

District heating

Ystad Energi AB

Ystad Arena is located in the southern Swedish city of Ystad, and is the home arena of Ystad IF HF which is one of the country’s top handball teams. On its roof, 36 collectors from Savosolar were mounted during spring 2017. The system is owned and maintained by the municipality owned energy company Ystad Energi AB, and feeds its district heating network with clean thermal energy. Ystad Energi AB is working towards the goal of becoming fossil fuel free by 2020 and currently produces ca. 160,000 MWh of thermal energy annually, of which 97-99% are based on bio-fuels.

As much as 89% of the thermal energy for the district heating network is produced by four wood chip burners between 3 and 10 MW capacity and the rest is produced from straw, rapeseed, gas and oil. Ystad Energi AB has ca. 1,850 customers, of which ca. 1,300 are single family homes.

Location

Sweden

Construction status

Finished

Installation year

2017

Solution type

District heating

Number of collectors

36

Collector Area

534 m2
, gross

Collector Type

Savo 15 SG

Power

400 kW

Energy production

160
MWh/a

Lolland Forsyning

Lolland forsyning’s district heating plant in Søllested is located on the island of Lolland and was the first installation, where Savosolar’s double glazed collectors were used. The double glazing reduces heat losses through the glass side of collector and offers a higher efficiency, especially at higher operation temperature levels and during the darker months of the year. Søllested district heating plant has ca. 500 customers and also uses a 5 MW straw boiler and an oil burner to produce its heat.

The collector field in Søllested has a so-called hybrid field, with both single and double glazed collectors. The single glazed collectors are in the cold end of the collector rows and increase the low temperature as rapidly as possible, while the double glazed collectors are located in the warm side of the collector rows where it is more important to reduce the heat losses.

In Søllested, Savosolar was faced with a special challenge since the customer’s land has a sewerage pipe running through it. Since the owner of the sewer pipe needs to be able to access it in case of maintenance, Savosolar supplied a collector field which both optimised the use of the available land, while still providing access to the sewer pipe

Fernwärme Ettenheim

As a general contractor, Savosolar built a solar thermal system on behalf of Fernwärme Ettenheim GmbH for the largest possible solar feed-in into the existing district heating network. 112 pieces Savo 15 SG-M large collectors generate fuel-free healthy heat, which is temporarily stored in two 100 m³ buffer storage tanks.
This also allows the operating hours of the CHP and the biomass boiler to be optimized. The scope of delivery included the fence and video surveillance system, as well as the creation of a meager meadow to enrich local biodiversity.

The construction work was temporarily interrupted due to the COVID19 restrictions. All system hydraulics were completely housed in a container. The keys were handed over in October 2020.

A PV system still to be built on the east side will generate the electricity for the pumps in the future.

The picture on the left shows the boiler house and the buffer storage tank. Handover of keys from Jari Varjotie, CEO Savosolar Oyj, to Peter Blaser, managing director of the customer.

Suur-Savon Sähkö

Savosolar has been selected as general contractor to build the largest solar thermal system in Finland to date, on behalf of Suur-Savon Sähkö Oy for its district heating network in Puumala, which supplies households with healthy heating. In this hybrid installation the solar thermal system is producing both, high-temperature heat to district heating supply pipe and also low-temperature heat to improve heat pump plant COP.