UNDER CONSTRUCTION

Bad Rappenau, Germany (largest flat plate collector plant in Germany)

Savosolar has been selected as general contractor to build a +20 MW solar thermal system on behalf of Bauer Holzenergie GmbH for its district heating network, which supplies households and an industrial process for drying fruits with healthy heating. Only about 1,800 pieces of Savo 16S large scale high performance flat plate collectors are sufficient to getting combined with an 8,000 m³ heat storage tank and
provide carbon free heat for the needs of all connected consumers.
Additionally, a PV system will be built on site to generate the electricity consumed by the solar pumps, thus
unburdening the local power grid.

Location

Germany

Construction status

Finished

Installation year

2024

Solution type

District heating

Number of collectors

1809

Collector Area

26827 m2
, gross

Collector Type

Savo 16 S

Power

20400 kW

Energy production

13000
MWh/a

Narbonne

With this new solar thermal plant for newHeat, Savosolar add a new leading reference in the French market of solar district heating. This approximately 3,000 m2 solar thermal field (aperture), will allow to replace 2,410 MWh of former gas heated heat by renewable heat on Narbonne’s city network, manage by a subsidary of Dalkia.

Savosolar, on the behalf of newHeat, built mainly the whole solar plant, from the solar collector’s field until the outlet of the heat exchanger to the storage thermal tank, ie: solar field, piping and solar station. More then 200 of our Savo 15 SG-M collectors, ensuring a high energy yield while reducing 510 tons of CO2 emissions per year from the district heating system of the city. The production of solar field during winter will even allow an increasing of the yield of the existing biomass boiler.

Suur-Savon Sähkö

Savosolar has been selected as general contractor to build the largest solar thermal system in Finland to date, on behalf of Suur-Savon Sähkö Oy for its district heating network in Puumala, which supplies households with healthy heating. In this hybrid installation the solar thermal system is producing both, high-temperature heat to district heating supply pipe and also low-temperature heat to improve heat pump plant COP.

La Caridad

Savosolar and its partner Jorgensen have been selected by Grupo Mexico for the implementation of their first solar thermal plant to deliver carbon free heat to their mining process. In this very energy efficient mining process, only 62 pieces of Savo 15SGM large scale high performance flat plate collectors are sufficient deliver 1,2 GWh of energy over the year and cover 100% of the production need during most of the sunny season.